Accelerator History - From the Main Ring to the Energy Doubler
Linac - Historical moment at NAL (April, 1969)
- Linac achieves highest proton beam energy in U.S. (August, 1970)
- NAL Linac achieves full design energy of 200 MeV (December, 1970)
- Booster Section gets a "Big Boost" (March, 1970)
- First NAL cooling pond becomes operational (August, 1970)
- First quarter of Booster is powered (August, 1970)
- Booster Installs Last of 96 Magnets
- Booster achieves full design beam energy of eight BeV (June, 1971)
- NAL starts work on Main Ring enclosure (October, 1969)
- The Gazebo (November, 1969)
- The Main Ring falls into place (April, 1970)
- Main Ring's final pre-cast section lowered into place (December, 1970)
- Final Main Ring magnet installation day and night task (April, 1971)
- Proton beam guided through entire NAL accelerator system (July, 1971)
- Main Ring staff works around-the-clock to tune accelerator (August, 1971)
- NAL accelerator reaches design energy (March, 1972)
- "NAL in transition" - Boyce McDaniel (May, 1972)
- 5th Anniversary. Recalling December 1, 1968... and The Interim... December, 1973...
- 0.5 TeV (May, 1976)
- NAL group builds successful beam monitor system (December, 1971)
- Meet the NAL accelerator operators (February, 1972)
- NAL beam headed toward experimental areas (April, 1972)
- Switchyard group readies 3-way split (February, 1973)
Main Ring Transition to Energy Doubler/Saver
- RRW: "Energy Doubler" appears to be feasible concept (March, 1971)
- Colliding beams at Fermilab? (March, 1976)
- New milestones in Doubler progress (April, 1976)
- POPAE colliding beam design study announced (June, 1976)
- Saver/Doubler refrigerators tested (February, 1977)
- Flying Fermilab skies (March, 1977)
- Energy Doubler reaches new milestone (April, 1977)
- Success! Prototype magnet passes test (June, 1977)
- A challenge met (July, 1977)
- Laying cable at a 5,000-foot-per-day clip! (August, 1977)
- Accelerator down, construction up (August, 1977)
- Accelerator upgrading , Part II (September, 1977)