Historical Content Note: The following material is reprinted from publications from throughout Fermilab's history. It should be read in its original historical context.
Progress Report, June 11-June 25, 1972
PROGRESS REPORT - JUNE 11 THROUGH JUNE 25, 1972 The accelerator operated satisfactorily on June 8 providing 200 BeV beam to the Neutrino Laboratory. After an initial test run of over 5,000 pictures taken with 35mm cameras, an additional 37,574 pictures were taken with the 70mm stereo camera system on the 30-inch Buble Chamber during the running period of June 25th.During a 3-day shutdown beginning June 26, computer improvements in the control systems were instituted. A search was made of the Main Ring vacuum chamber for obstacles that might account for beam loss. The hydrogen gas target for Experiment 36 was installed in the Main Ring.